- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Nuclear Fuel Complex
- >
NTID 43492521
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Painting Of Stru in Tuticorin - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Painting Of Stru" in Tuticorin, India.
Nuclear Fuel Complex
Tuticorin, Tamil Nadu, India
NTID 43492521
- Opening Date : Sat 31st January, 2026
- Closing Date : Fri 30th January, 2026
- ₹ 975500.00
- NTID 43492521
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
19510.00 -
Document Cost
Refer Documents -
Estimated Cost
975500.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Extension for Bid Submission | Date |
BOQ Items Total Items : 2 | Total Qty : 4300
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Painting of structural members, pipelines, Pipe racks and EOT crane in Oxide production facility. The work includes Surface preparation and applying one coat of primer, two coats of Polyurethane paint on structures, pipelines, piperacks, EOT crane with DFT not less than 120micron The scope of work includes the supply of Polyurethane paint, primer, thinner, cleaning materials, tools, tackles and manpower for completing the job as required and directed by the Engineer in- charge. Note: 1) Vendors are advised to visit the site for accessing the work before quoting. 2) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item 3) Paint/Primer/Thinner should be Asian/Berger/Nerolac/Pidilite make | 2300 | Sq.m |
| 2 | Erection & de-erection of scaffolding at various locations of Oxide production facility, Zirconium Complex as per engineer in charge direction for painting work with supply of required scaffolding pipes, clamps, safety platform grills etc as per IS:4014(Part 1&2)-1967 and directed by the Engineer in- charge. Note: 1) The rate shall include cost of material, consumable, labour, and other expenditure involved for finished item | 2000 | Sq.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054