- Home
- >
- Tender
- >
- Jammu and Kashmir Tender
- >
- Department of Srinagar Smart City Limited
- >
NTID 42988392
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Floral Beautific in Srinagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Floral Beautific" in Srinagar, India.
Srinagar Smart City Limited
Srinagar, Jammu and Kashmir, India
NTID 42988392
- Opening Date : Tue 16th December, 2025
- Closing Date : Mon 15th December, 2025
- ₹ 0.00
- NTID 42988392
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
200000.00 -
Document Cost
2000.00 -
Estimated Cost
Refer Documents
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Extension Notice No 01 | Date |
| 2 | Pre-Bid Meeting | Other |
BOQ Items Total Items : 29 | Total Qty : 26
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | a. Preparation of beds for plantation of flowering Annuals/Bulbs/Corms by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking the clods and mixing with sludge or manure in the ration of 8:1 (8 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of sludge or manure after reduction by 8 %), flooding with water, filling with the earth if necessary, watering and finally fine dressing, leveling etc. including stacking & disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. complete (cost of sludge, manure or extra earth to be paid for separately) b. Providing, supplying and planting of F1 Hybrids at flower bud stage, ready to bloom, well developped root system contained in a polybag as per the seasonal requirements or as directed by the officer in-charge. For Flowers with Blooming Period March- May planted at a varying spacing of 150mm to 200 mm c/c. Pansy (Viola tricolour) Dianthus (Dianthus Chinensis) Stock (Matthiola Incana) Antirrhinum (Sanpdragon) (Antirrhinum Majus) Alyssum (Lobularia maritima) to be planted by First week of March. | 1.00 | Sqm |
| 2 | a. Preparation of beds for plantation of flowering Annuals/Bulbs/Corms by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking the clods and mixing with sludge or manure in the ration of 8:1 (8 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of sludge or manure after reduction by 8 %), flooding with water, filling with the earth if necessary, watering and finally fine dressing, leveling etc. including stacking & disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. complete (cost of sludge, manure or extra earth to be paid for separately) . b. Providing, supplying and planting of F1 Hybrids at flower bud stage, ready to bloom, well developped root system contained in a polybag as per the seasonal requirements or as directed by the officer in-charge. For Flowers with Blooming Period April-June planted at a varying spacing of 150mm to 200 mm c/c. Poppy (Shirley/California) (Papaver Rhoeas/Eschscholzia) Larkspur (Delphinium Consolida) Sweet Pea (Lathyrus Odoratus) Calendula (Pot Marigold) (Calendula officinalis) to be planted by First week of April. | 1.00 | Sqm |
| 3 | a. Preparation of beds forplantation of flowering Annuals/Bulbs/Corms by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking the clods and mixing with sludge or manure in the ration of 8:1 (8 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of sludge or manure after reduction by 8 %), flooding with water, filling with the earth if necessary, watering and finally fine dressing, leveling etc. including stacking & disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. complete (cost of sludge, manure or extra earth to be paid for separately). b. Providing, supplying and planting of F1 Hybrids at flower bud stage, ready to bloom, well developped root system contained in a polybag as per the seasonal requirements or as directed by the officer in-charge. For Flowers with S Blooming Perios April-May planted at a varying spacing of 150mm to 200 mm c/c. Tulip (Tulipa gesneriana) to be planted by First week of April. | 1.00 | Sqm |
| 4 | a. Preparation of beds for plantation of flowering Annuals/Bulbs/Corms by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking the clods and mixing with sludge ormanure in the ration of 8:1 (8 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of sludge or manure after reduction by 8 %), flooding with water, filling with the earth if necessary, watering and finally fine dressing, leveling etc. including stacking & disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. complete (cost of sludge, manure or extra earth to be paid for separately) . b. Providing, supplying and planting of F1 Hybrids at flower bud stage, ready to bloom, well developped root system contained in a polybag as per the seasonal requirements or as directed by the officer in-charge. For Flowers with Blooming Period March-April planted at a varying spacing of 150mm to 200 mm c/c Hyasinth (Hyasinthus Orienthalis) to be planted by First week of March. | 1.00 | Sqm |
| 5 | a. Preparation of beds for plantation of flowering Annuals/Bulbs/Corms by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking the clods and mixing with sludge or manure in the ration of 8:1 (8 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of sludge or manure after reduction by 8 %), flooding with water, filling with the earth if necessary, watering and finally fine dressing, leveling etc. including stacking & disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 mtr. and lift upto 1.5 mtr. complete (cost of sludge, manure or extra earth to be paid for separately) b. Providing, supplying and planting of F1 Hybrids at flower bud stage, ready to bloom, well developped root system contained in a polybag as per the seasonal requirements or as directed by the officer in-charge. For Flowers with Blooming Period May-Oct planted at a varying spacing of 150mm to 200 mm c/c. Hyasinth Petunia (Petunia hybrida) to be planted by First week of May. | 1.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054