- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of UTTARAKHAND JAL VIDYUT NIGAM LIMITED
- >
NTID 43772741
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Drifting Work Fo in Dehradune - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Drifting Work Fo" in Dehradune, India.
UTTARAKHAND JAL VIDYUT NIGAM LIMITED
Dehradune, Uttarakhand, India
NTID 43772741
- Opening Date : Thu 2nd April, 2026
- Closing Date : Fri 27th March, 2026
- ₹ 22309600.00
- NTID 43772741
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
557800.00 -
Document Cost
11800.00 -
Estimated Cost
22309600.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Extension Notice No-01 | Date |
| 2 | Date extention 2 | Date |
BOQ Items Total Items : 10 | Total Qty : 1047.45
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Making investigation of drift of size 1.80 m X 2.10 m of desired length at various locations including over break in all type of rock (including hard rock), construction of portal/face, cost of blasting materials, explosive and its arrangement operational cost and labour, including disposal of excavated material, dewatering if required, lighting arrangement and running cost of compressor and its accessories, adequate ventilation etc. with all labour, material and T&P required for proper completion of work. | 400.000 | RM |
| 2 | Supply, making and fixing complete timber support system at various location (as desired by the Engineer- in-Charge) in investigation of drift size 1.80 m X 2.10 m including cost of chir wood, local wood, sleepers of size 25 cm X12.50 cm sections, its carriage upto the siteof work including the size of iron strips, nails, black paint, with all labours, materials and T&P etc. required for proper completion of work. | 20.000 | Cum |
| 3 | Increase in size of drift at various location in all types of soil / rock (including hard rock), cost of blasting materials, explosive & its arrangements, operational cost and labour including disposal of excluded materials, lighting arrangement and running cost of compressor and its accessories, adequate ventilation with all labours, material and T&P required for proper completion of work. | 50.000 | Cum |
| 4 | Geological Logging/ 3D Logging of drift as per Indian Standard and submission of report in all respect. | 400.000 | RM |
| 5 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (For foot track and other works ) | 90.000 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054