- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Department Of Water Resources
- >
NTID 42808069
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Ddp-53 Balance in Puri - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Ddp-53 Balance " in Puri, India.
- Opening Date : Wed 10th December, 2025
- Closing Date : Thu 4th December, 2025
- ₹ 289502.00
- NTID 42808069
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Due Date Extended for tenders closing on 02-12-2025. | Admin Corrigendum Date Extend |
BOQ Items Total Items : 3 | Total Qty : 502.34
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation of foundation in ordinary soil including dressing and levelling the bed of founation and disposal of excavated materials within initial lead of 50m with one extra lift over intitial lift of 1.5M including bailing out water as per the direction of the Engineer-in-charge. | 89.17 | One Cum |
| 2 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within lead of 1 Km on properly prepared and scientifically approved surface for construction of embankment including spreading and leveling the earth in 22.5 cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dam and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area including royalty of earth etc. complete as per the direction of Engineer-in-charge. (Measurement of the fill to be taken on the finished compacted section under OMC condition) | 324.00 | One Cum |
| 3 | R.R stone packing in apron and revetments with hard stone granite of size not less than 0.0025 cum size to proper line and level with cost of stones and all labour required including conveyance of the stones etc. complete as directed by the Engineer-in-charge. | 89.17 | One Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054