- Home
- >
- Tender
- >
- Nagaland Tender
- >
- Department of Nagaland Urban Infrastructure Development Project
- >
NTID 46179985
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Dbo 01 Comprehen in Dimapur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Dbo 01 Comprehen" in Dimapur, India.
- Opening Date : Mon 7th September, 2026
- Closing Date : Mon 7th September, 2026
- ₹ 0.00
- NTID 46179985
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
12000000.00 -
Document Cost
25000.00 -
Estimated Cost
Refer Documents
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum1ChumoukedimaWS | Date |
BOQ Items Total Items : 166 | Total Qty : 1374269.69
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Schedule -1 Topographical Survey, Geotechnical investigation, Design, Drawing & Documentation work for Water supply and other ancillary works: Work Shall Include Design, Engineering, Preparation of Good for Construction drawing for civil, structural, mechanical electrical & instrumentation and vetting of major RCC structures from reputed Govt. institute (IIT/NIT or approved by Employer) Pipe line route survey ,Proposed & Existing Components Plot Survey,Household survey (Door to Door Survey), geo-tagging, Trial pits etc. as per Technical specification and as directed by Employer, | 1 | Job |
| 2 | Schedule -2 Dismatling of existing structures like culverts, bridges,retining walls and other structure comprising of masonary, cement concrete, woo work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled amterail, disposal of unserviceable materail an stacking the servieable materail ith all lifts an lead of 1000 meters By Mechanical means Prestresed /Reinforced cement concrete grade M-20 and above | 129.05 | Cum |
| 3 | REPAIR AND REHABILITATION of WTP - Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. | 168 | Sqm |
| 4 | Temporary barricading Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50mx2.00m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube posts/horizontal members/bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m. MS channel ISLC 75 @ 5.70 kg/m, 50cm long shall be provided at the bottom having oval shaped holes of size 50x25mm at both ends with 50cm long MS angle 40x40x6mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250mm long expansion fasteners at both ends. The work shall be executed as per drawing/ direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for Shifting to other location, damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). | 1870 | Metre |
| 5 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5m All kinds of soil | 1303.2 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054