ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Wor in Garhwal - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Wor" in Garhwal, India.
MD Uttarakhand Agriculture Produce Marketing Board Rudrapur
Garhwal, Uttarakhand, India
NTID 45343279
- Opening Date : Mon 15th June, 2026
- Closing Date : Mon 15th June, 2026
- ₹ 17742000.00
- NTID 45343279
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
355000.00 -
Document Cost
4720.00 -
Estimated Cost
17742000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date | Date |
BOQ Items Total Items : 11 | Total Qty : 4738.83
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in Hill Road (Hill Side Cutting) 1-1-1 Excavation in soil in Hilly Area by mechanical means 1-1-1-A Excavation in soil in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 | 29.18 | Cu M |
| 2 | Earthwork in Hill Road (Hill Side Cutting) Excavation in Hilly Areas in Hard Rock requiring blasting Excavation in hilly areas in hard rock requiring blasting, by mechanical means without using Dozer , lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2. | 9.73 | Cu M |
| 3 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 682.77 | Cu M |
| 4 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required forproper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 107.51 | Cu M |
| 5 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 586.40 | Cu M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054