NTID 42851355
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Wor in Gauriganj - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Wor" in Gauriganj, India.
Public Works Department
Gauriganj, Uttar Pradesh, India
NTID 42851355
- Opening Date : Sat 27th December, 2025
- Closing Date : Sat 27th December, 2025
- ₹ 7000000.00
- NTID 42851355
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
550000.00 -
Document Cost
2714.00 -
Estimated Cost
7000000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Extend | Date |
| 2 | Date Extend 3 | Date |
BOQ Items Total Items : 20 | Total Qty : 3259.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dimolishing Brick Work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. For Dismantling of Old Culvert | 110.00 | Cum |
| 2 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled material as directed by the Engineer-in-Charge within a distance of 60 metres (200 ft.) For Dismantling of Old Culvert | 18.00 | Cum |
| 3 | Laying rienforced cement concrete pipe 900 dia NP3 for culvert on first class bedding in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. For Construction of Diversion | 30.00 | Rm |
| 4 | Construction of embankment with approved material obtained form borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 For Construction of Diversion | 850.00 | Cum |
| 5 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. For Construction of Box Cell Culvert | 385.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054