- Home
- >
- Tender
- >
- Jammu and Kashmir Tender
- >
- Department of Ratle Hydroelectric Power Corporation Limited
- >
NTID 44137411
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Kishtwar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Kishtwar, India.
Ratle Hydroelectric Power Corporation Limited
Kishtwar, Jammu and Kashmir, India
NTID 44137411
- Opening Date : Sat 28th March, 2026
- Closing Date : Mon 23rd March, 2026
- ₹ 6079937.00
- NTID 44137411
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
122000.00 -
Document Cost
1180.00 -
Estimated Cost
6079937.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum_1 | Date |
BOQ Items Total Items : 10 | Total Qty : 18854.55
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.(40% All kinds of soil + 60% Ordinary Rock). | 3484.00 | Cum |
| 2 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: | 1393.60 | Cum |
| 3 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 3264.60 | Cum |
| 4 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 2655.68 | Sqm |
| 5 | Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade. | 2655.68 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054