- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of GOVERNMENT OF JHARKHAND
- >
NTID 42901656
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Dhanbad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Dhanbad, India.
- Opening Date : Fri 26th December, 2025
- Closing Date : Tue 23rd December, 2025
- ₹ 27722023.00
- NTID 42901656
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
277300.00 -
Document Cost
10000.00 -
Estimated Cost
27722023.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Change of Bid Submission End Date and Bid Opening Date | Date |
| 2 | Clause 4.5 (c) of GENERAL TERMS AND CONDITIONS | Other |
BOQ Items Total Items : 479 | Total Qty : 50759505.51
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth Work in excavation in Foundation Trenches in Ordinary soil (vide classification of soil item -B) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I | 567.55 | CUM |
| 2 | Extra for earth work in hard soil as per specification & direction of engineer in charge (Vide classification of soil item B) | 283.78 | cum |
| 3 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50 mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 330.53 | cum |
| 4 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer In charge (Mode of measurement compacted volume) | 34.10 | Cum |
| 5 | Providing and laying in position cement concete of soecified grade excluding the cost of centering and shuttering - All work up tp plinth level: 1:4:8 (1 cement :4 coarse sand (Zone -III) :8 graded stone aggregrate 40 mm normial size) | 77.51 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054