Inquiry NowCorrigendum Construction Of in Trimbak - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Trimbak, India.
Infrastructure Development Authority
Trimbak, Maharashtra, India
NTID 42627276
- Opening Date : Mon 1st December, 2025
- Closing Date : Fri 28th November, 2025
- ₹ 669750870.00
- NTID 42627276
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
6697509.00 -
Document Cost
11800.00 -
Estimated Cost
669750870.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date extension | Date |
BOQ Items Total Items : 510 | Total Qty : 613578.149
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cutting down trees including trunks and branches with girths above 30 cm. to 60 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 40.00 | Number |
| 2 | Cutting down trees including trunks and branches with girths above 60cm to 90cm and stacking the materials neatly with all lifts and lead of 1000m. as directed and earth filling in the depression/pit if any. | 5.00 | Number |
| 3 | Cutting down trees including trunks and branches with girths above 90 cm. to 180 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 5.00 | Number |
| 4 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means.. | 6,621.38 | Cubic Metre |
| 5 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the buildingareaandstacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 2,047.92 | Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054