- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of Jharkhand Police Housing Corporation Limited
- >
NTID 44449848
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Ranchi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Ranchi, India.
- Opening Date : Fri 10th April, 2026
- Closing Date : Wed 8th April, 2026
- ₹ 3313941.00
- NTID 44449848
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
67000.00 -
Document Cost
5000.00 -
Estimated Cost
3313941.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Corrigendum | Date |
BOQ Items Total Items : 60 | Total Qty : 5645.49
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Building work | ||
| 2 | 5.1.1 EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. | 92.23 | CU.M |
| 3 | 5.1.2 Extra for earthwork in hard soil as per specification and direction of E/I. ( Vide classification of soil iten _B) | 92.23 | CU.M |
| 4 | 5.1.8 EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 92.23 | CU.M |
| 5 | 5.1.10 Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) | 10.28 | CU.M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054