- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of PANCHAYAT SAMITI
- >
NTID 44602952
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Const C c Road in Chakur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Const C c Road " in Chakur, India.
PANCHAYAT SAMITI
Chakur, Maharashtra, India
NTID 44602952
- Opening Date : Mon 6th April, 2026
- Closing Date : Sat 4th April, 2026
- ₹ 1494585.00
- NTID 44602952
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
14946.00 -
Document Cost
200.00 -
Estimated Cost
1494585.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Extended | Date |
BOQ Items Total Items : 10 | Total Qty : 682.44
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for foundation in earth soil of all types, sand, gravel and soft murum including removing the excavated material up to a distance Bd A.1 Page No. 259 SSR OF 2022-23 ITEM NO. 21.02 & PAGE NO.153 BASIC RATE | 67.500 | Cu.M |
| 2 | Excavation for roadway in earth soil of all sorts , sand gravel or soft murum including dressing section to the required grade camber MORTH 301 SSR OF 2022-23 ITEM NO.2.11 & PAGE NO.23 BASIC RATE | 146.160 | Cu.M |
| 3 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with crushed sand / grift ramming watering etc. complete As directed by Engineer in charge SSR OF 2022-23 ITEM 21.4 & PAGE NO.157 RATE ANALYSIS | 146.160 | Cu.M |
| 4 | Providing and laying Cast in situ / Ready Mix cement concrete in M-10 of trap / granite / quartzite / gneiss metal for foundation and Bd. E.1 Page No.287 SSR OF 2022-23 ITEM NO.24.01 & PAGE NO.175 RATE ANALYSIS | 9.000 | Cu.M |
| 5 | Providing and laying Cast in situ / Ready Mix cement concrete in M-20 of trap/ granite / quartzite / gneiss metal for blocks Bd. E4 Page No.289 and B-7 Page no.38 SSR OF 2022-23 ITEM NO.24.1 & PAGE NO.176 RATE ANALYSIS | 112.440 | Cu.M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054