- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Industries and Commerce Department
- >
NTID 44112591
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Annual Maintenan in Dibrugarh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Annual Maintenan" in Dibrugarh, India.
- Opening Date : Fri 27th March, 2026
- Closing Date : Thu 26th March, 2026
- ₹ 0.00
- NTID 44112591
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10440.00 -
Document Cost
100.00 -
Estimated Cost
Refer Documents
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Extension | Date |
| 2 | Extension of Bid due date | Date |
BOQ Items Total Items : 6 | Total Qty : 135
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | ANNUAL MAINTENANCE OF SERVICE-ROOM AIR CONDITIONERS | ||
| 2 | Complete overhauling of Room Air-Conditioners (Window/ Split) including cleaning of condensers and evaporators by soap solution, lubrication of all moving parts, painting of chassis etc. This include maintenance of Room Air-Conditioners, repair/ replacement of blower fan motor, repair or replacement of compressors, charging of refrigerant and supply and fitting of spares such as thermostat, PCB, capacitors, starting capacitors, fan capacitor, starting relay, selector switch, air filter etc. | 95.000 | Nos. |
| 3 | Installation charges of window type AC machine of 1.00 Ton to 2.00 Ton Capacity | 5.000 | Nos. |
| 4 | Installation charges of split type AC machine of 1.00 Ton to 2.00 Ton Capacity | 15.000 | Nos. |
| 5 | Dismantling shifting and re-installation charges of window type ac machine of 1.00 Ton to 2.00 Ton capacity. Bidder has to supply all the additional material such as copper pipe with insulation, electrical cable, refrigerant etc. if required for installation/ commissioning the air conditioner after shifting | 5.000 | Nos. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054