Inquiry NowCorrigendum 753066a Provn Of in Gopalpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum 753066a Provn Of" in Gopalpur, India.
- Opening Date : Mon 9th November, 2026
- Closing Date : Mon 2nd November, 2026
- ₹ 34500100.00
- NTID 46763428
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
420100.00 -
Document Cost
2000.00 -
Estimated Cost
34500100.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum No 01 | Date |
BOQ Items Total Items : 27 | Total Qty : 462
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | ||
| 2 | Item no 1: Design and construction of Physical training shed (Size of Each Shed : 36m X12m ) having ceiling height of 5.5 m, with permanent specification, RCC Framed Construction, M-30 Concrete, Provn of ATT, APP for roof treatment, exterior emulsion / Weather Coat in external surface finish complete all specified in design basis report, drawings and tender documents. | 3 | Nos |
| 3 | Sch 'A' Part-II (External Electrical Supply) Lump sum price worked out by the contractor for 'External Electrifical Supply' as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum |
| 4 | Sch 'A' Part-III (Road Path Culvert) Lump sum price worked out by the contractor for 'Road Path Culvert', excavation & earth works' as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum |
| 5 | Sch 'A' Part-IV (Area Drainage) Lump sum price worked out by the contractor for 'Area Drainage' as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054