Inquiry NowConsultancy For Construction O in Mumbai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Consultancy For Construction O" in Mumbai, India.
Military Engineer Services
Mumbai, Maharashtra, India
NTID 45677941
- Opening Date : Wed 5th August, 2026
- Closing Date : Wed 29th July, 2026
- ₹ 4478000.00
- NTID 45677941
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
89560.00 -
Document Cost
500.00 -
Estimated Cost
4478000.00
BOQ Items Total Items : 16 | Total Qty : 4
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | M&L Providing Consultancy Services for Preparation of Preliminary Architectural and structural design with drawings, detailed architectural and structural design with drawings. (Proof checking and duly vetting by any one of IIT Mumbai, IIT Kanpur, IIT Delhi, IIT Madras, IIT Kharagpur & IIT(ISM) Dhanbad, schedule of finishes, typical drawings, foundation details, design calculations, preparation of detailed estimate including DSR and non- DSR item, yardstick, Plinth area rates, Abstract & Market rate analysis of each items of all sch A including BOQ & taking of quantities and abstract prices in DSC and submission of detailed market rate analysis for each items including internal and external services with fitting and fixtures, circuit diagrams, schematic diagrams alongwith quotations complete for purposed construction of infrastructure at outfitting building at ND (Mumbai) The details of scope of work are as follows. | 1.00 | JOB |
| 2 | (a) Construction of Ground floor - Plinth area - 1280.00 sqm with height 10.00 mtr. (b) Construction of Mezzanine floor - Plinth area - 448.00 Sam with height 3.00 mtr. (c) Construction of First floor - Plinth area - 1280.00 Sqm with height 5.00 mtr. (d) Construction of Second floor - Plinth area - 1280.00 Sqm with height 3.00 mtr. (e) Construction of Ground floor for parking - Plinth area - 120.00 sqm with height 5.00 mtr (f) Construction of First floor for awning section - Plinth area - 120.00 Sqm with height 4.00 mtr. (g) Construction of Second floor for cover section - Plinth area -120.00 Sqm with height 3.00 mtr. (h) Construction of Third floor Upholstery Section - Plinth area -120.00 Sqm with height 3.00 mtr. (i) Construction of Forth floor and screen-printing section - Plinth area- 120.00 Sqm with height 3.00 mtr. (j) Construction of per permanent Pump House bldg. for firefighting with RCC frame structure Area 36.00 sqm. (k) Construction of RCC underground water tank of capacity 20000LTR. | ||
| 3 | BOQ and stage wise yardstick on the format given by contract section shall be submitted to the contract section for approval. To submit integrated project execution schedule for the work, CPM chart showing various activities in the work project execution schedule to be on PERT. The Consultant shall mandatorily submit costed schedules of work along with a comprehensive comparative statement for the subject work namely- Schedules shall be prepared in consultation with the GE and shall be accompanied by detailed rate analysis for all non-DR items for obtaining Technical Sanction. The consultant shall ensure that all rates, specifications, quantities and analysis are technically sound, duly justified, and in conformity with prevailing standards and departmental norms. The report, along with the aforesaid schedules, comparative statement, detailed specifications and supporting documents shall be submitted only after obtaining approval from the Planning and Works Section. Any omission, discrepancy, unsupported rate or deviation from prescribed norms shall be liable for rejection and the Consultant shall be responsible for rectification without any additional financial implication to the department. | ||
| 4 | Consultant shall give certificate stating that exiting structure is capable to take additional load/stress may occur during and after construction of above floor/facilities. He will arrange suitable specialize supervisory staff from his side during construction and issue a certificate stating all important stages have been inspected and passed by him. | ||
| 5 | MEP Services:- Electric Supply:- Preparation of lighting design, wiring layout, including TV conduits and its wire detailing, single line diagram (s), equipment sizing & selection, and BOQ including TV conduits and its wire detailing. External Electric Supply: - Comprehensive and all-inclusive design and estimating of external electric supply system including LT Panel, LT Cable, Bus Trucking, Cable trays etc to cater for the electrical requirements of the complete project. External Water Supply and Internal Water Supply: Comprehensive and economical design and drawings and BOQ of all external water supply, bore well, pumping, pump house and hydraulic calculations for all water supply and internal water supply with hot water supply system and plumping services. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054