- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Agra Development Authority
- >
NTID 46007456
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Work For A Cc Roa in Agra - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Work For A Cc Roa" in Agra, India.
Agra Development Authority
Agra, Uttar Pradesh, India
NTID 46007456
- Opening Date : Sat 1st August, 2026
- Closing Date : Fri 31st July, 2026
- ₹ 0.00
- NTID 46007456
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
146500.00 -
Document Cost
5900.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 16 | Total Qty : 10675
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | DRAIN (PART-A) :- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means overareas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineerin-charge. 2.6.1 All kinds of soil DSR 2023 | 141 | Cum |
| 2 | Providing and laying cement concrete in 1:4:8 (1 cement : 4 course sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR No. 4.1.8/2023) | 18 | Cum |
| 3 | RCC work Providing and laying in position specified grade of reinforced cement concrete,Slab including the cost of centering, shutterang, finishing and excluding reinforcement - Above plinth level upto fifth floor lable : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone (DSR 2023 5.1.2) | 23 | Cum |
| 4 | Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, plers, abutments, posts and struts etc, including cost of centering, shuttering, finishing and excluding reinforced :- 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). (Item No. 5.2.2 DSR 2023) i) upto plinth level | 35 | Cum |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 2023/ Item 5.3) | 2 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054