- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Bodoland Territorial Council
- >
NTID 44331669
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Vcdc Office Bu in Nalbari - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Vcdc Office Bu" in Nalbari, India.
- Opening Date : Mon 30th March, 2026
- Closing Date : Fri 27th March, 2026
- ₹ 4000000.00
- NTID 44331669
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
80000.00 -
Document Cost
800.00 -
Estimated Cost
4000000.00
BOQ Items Total Items : 48 | Total Qty : 6449928.92
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth leadupto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.2.6.1 All kinds of soil. | 89.10 | Cu.m |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 122.54 | Cum |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. 5.22C.1 Thermo-Mechanically Treated bars of grade Fe-500D or more | 1855.25 | Kg |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22C.1 Thermo-Mechanically Treated bars of grade Fe-500D or more | 2547.72 | Kg |
| 5 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 844.27 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054