- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 43159827
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Two No Of Stor in Bhanjanagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Two No Of Stor" in Bhanjanagar, India.
GOVERNMENT OF ORISSA
Bhanjanagar, Odisha, India
NTID 43159827
- Opening Date : Tue 23rd December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 6665288.00
- NTID 43159827
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
66700.00 -
Document Cost
10000.00 -
Estimated Cost
6665288.00
BOQ Items Total Items : 182 | Total Qty : 9040.81
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK Dismantling brick or stone masonary in lime or cement mortar below 10" height including stacking the useful materials for reuse and removing the debris with 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. | 49.210 | cum |
| 2 | Dismantling and removing RCC columns, beams, slab, staircase, landing, lintels including stacking the materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. | 19.250 | cum |
| 3 | Dismantling and removing RCC chajja, shelves, fins and parapets including stacking the materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. | 14.400 | sqm |
| 4 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. | 16.920 | sqm |
| 5 | GROUND FLOOR Earth work in excavation in foundation in hard or gravelly soil within 50 mtr. initial lead and 1.5 mtr. initial lift and transporting the same by mechanical means within 5.00 km. lead including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 mtr. depth including cost of all labour, labour cess and T&P for the work etc. complete and as directed by the Engineer-in-Charge. | 112.340 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054