- Home
- >
- Tender
- >
- Jammu and Kashmir Tender
- >
- Department of Jammu and Kashmir State Sports Council
- >
NTID 45771905
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Synthetic Voll in Jummu - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Synthetic Voll" in Jummu, India.
Jammu and Kashmir State Sports Council
Jummu, Jammu and Kashmir, India
NTID 45771905
- Opening Date : Fri 24th July, 2026
- Closing Date : Thu 23rd July, 2026
- ₹ 2499000.00
- NTID 45771905
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
49980.00 -
Document Cost
800.00 -
Estimated Cost
2499000.00
BOQ Items Total Items : 31 | Total Qty : 6055.6
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 372.10 | sqm |
| 2 | Treatment of soil using chemical like round up for anti weeding laid in holes @ 300 mm c/c and consumpution @ 600 ml/ 10 Sqm | 372.10 | Sqm |
| 3 | Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade | 372.10 | Sqm |
| 4 | Excavating, supplying and filling of local earth (RBM)(including royalty)by mechanical transport upto a lead of 15 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 93.00 | cum |
| 5 | P/L and compacting stone agrregates of different sizes to form contour and elevation to the desired level as per the Drawing and instruction of Engineer Iincharge (size 40 mm /20 mm/10mm ) down black stone aggregate up to a depth of 300 mm from below primary backing . Layers of stone to be rolled as per desired slope and compaction using 8-10 tonnes Road roller over open area & pitch roller over areas with drainage pipes. | 83.72 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054