Inquiry NowConstruction Of Su Sasthya Ken in Tamluk - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Su Sasthya Ken" in Tamluk, India.
Public Works Department
Tamluk, West Bengal, India
NTID 42894770
- Opening Date : Mon 22nd December, 2025
- Closing Date : Fri 19th December, 2025
- ₹ 5824929.00
- NTID 42894770
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
116499.00 -
Document Cost
1500.00 -
Estimated Cost
5824929.00
BOQ Items Total Items : 305 | Total Qty : 10668758.584
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 186.66 | sqm |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm. | 86.280 | % Cu.M. |
| 3 | (b)Depth of excavation for additional depth beyond 1,500 mm. And upto 3,000mm. but not requiring shoring. | 17.64 | % Cu.M. |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) a) With earth obtained from excavation of foundation. | 103.92 | % Cu.M. |
| 5 | A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 42.64 | % Cu.M. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054