- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of GAIL(INDIA)LIMITED
- >
NTID 42829451
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Steel Pipeline in Noida - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Steel Pipeline" in Noida, India.
GAIL(INDIA)LIMITED
Noida, Uttar Pradesh, India
NTID 42829451
- Opening Date : Mon 1st December, 2025
- Closing Date : Sat 29th November, 2025
- ₹ 0.00
- NTID 42829451
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1319232.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 533 | Total Qty : 50871.4
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | SECTION-A : PIPELINE LAYING / INSTALLATION (CARBON STEEL PIPES) | ||
| 2 | Receiving and taking over, as defined in the specifications, handing, loading, transportation and unloading of Owner-supplied 3-layer PE coated line pipes, bare pipes along with associated fittings and valves from Owner's designated stock-yard to Contractor's stock-yard / workshop / work-site including preliminary activities, preparation of drawings, wherever required for crossing, etc. including handling, stacking, stringing on the pipeline Right-of-Use(ROU) /Right -of- Way (ROW)/ pipeline route alignment, carrying out inspection of Company-supplied materials, including line pipes, at the time of taking over, laying / installation of coated line pipes, associated fittings (IJ,Barred tee etc) and accessories, including execution of all works, taking over, handling, including loading and unloading, arrangement of all additional land required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner-supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline, as per drawings, specifications, other provisions of Contract Document and instructions of Engineer-in-Charge (EIC), including, but not limited to, carrying out following works: | ||
| 3 | Including marking the route map, alignment sheet, etc. drawings showing survey details, and submit same to Owner for review. | ||
| 4 | Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstructions within the ROU / pipeline route alignment, viz. electrical lines / poles, telephone lines / poles, coordination and liasioning with concerned authorities and obtaining NOCs from these authorities post completion of work. | ||
| 5 | Trenching to all depths and to a width to accommodate the pipeline and/or optical fiber cable/cable conduit during lowering & backfilling as specified in scope document and as per the relevant standards, specifications, etc by excavation in all types of soils ( except Rocky terrain), including controlled blasting, chiseling or otherwise cutting etc.; providing depth of padding (Soft soil or sand) /rock shield (as directed by EIC) in trench bed & above and around the pipeline HDPE duct and OFC as required with sand / graded earth approved by Engineer-in Charge; [The minimum depth of the top of pipeline shall be 1.2m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per Special Condition of Contract (SCC) / OISD - 141 OISD - 226]. Dewater of trenches if required as per site condition. Note : Additional payment on account of excavation in Rocky Terrain ( Where execavation is not possible by JCB, Poclin, Trencher, Manual etc. and Excevation shall be done by Breaker/Blasting required for execavation) for breaking rock will be done will be as per SOR item No. A00120 based on actual measurement for Rocky Terrain encountered as certified by the EIC. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054