- Home
- >
- Tender
- >
- Arunachal Pradesh Tender
- >
- Department of Indo Tibetan Border Police Force
- >
NTID 42701318
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Sos And Ors Li in Likabali - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Sos And Ors Li" in Likabali, India.
Indo Tibetan Border Police Force
Likabali, Arunachal Pradesh, India
NTID 42701318
- Opening Date : Mon 8th December, 2025
- Closing Date : Sat 6th December, 2025
- ₹ 24170861.00
- NTID 42701318
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
483417.00 -
Document Cost
Refer Documents -
Estimated Cost
24170861.00
BOQ Items Total Items : 60 | Total Qty : 35694.541
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation by manual means over area ( exceeding 30 cm in depth 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. : All kind of soil | 305.00 | Cum |
| 2 | Excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dresing of sides and ramming of bottoms lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed , within a lead of 50 m. All kind of soil | 233.26 | Cum |
| 3 | Filling available excavated earth ( excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completelead up to 50 m and lift up to 1.5 m | 224.94 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 7.265 | Cum |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 49.744 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054