- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of PANCHAYAT SAMITI
- >
NTID 42578979
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Small Bridge O in Palghar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Small Bridge O" in Palghar, India.
PANCHAYAT SAMITI
Palghar, Maharashtra, India
NTID 42578979
- Opening Date : Wed 12th November, 2025
- Closing Date : Mon 10th November, 2025
- ₹ 5175132.00
- NTID 42578979
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
51751.00 -
Document Cost
11800.00 -
Estimated Cost
5175132.00
BOQ Items Total Items : 26 | Total Qty : 1349.87
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 45.00 | One Cubic Metre |
| 2 | Removing Np-2 and Np-3 class pipes including stacking at road side as directed by the Engineer in charge. Upto 900mm dia. etc complete. | 67.50 | One Running Metre |
| 3 | Excavation for foundation in hard murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | 127.79 | One Cubic Metre |
| 4 | Excavation for foundation in hard murum and boulders including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | 51.11 | One Cubic Metre |
| 5 | Excavation for foundation in soft rock including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | 76.67 | One Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054