Inquiry NowConstruction Of Shedat Uttar P in Baduria - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Shedat Uttar P" in Baduria, India.
MUNICIPAL AFFAIRS DEPARTMENT
Baduria, West Bengal, India
NTID 43122063
- Opening Date : Fri 9th January, 2026
- Closing Date : Tue 6th January, 2026
- ₹ 237144.00
- NTID 43122063
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
4743.00 -
Document Cost
Refer Documents -
Estimated Cost
237144.00
BOQ Items Total Items : 8 | Total Qty : 174.398
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. P-1, It-2 | 0.58 | %m3 |
| 2 | Single brick flat solling of picked jhama bricks including ramming and dressing bed to proper level, and or local sand. P-14, Sl.-1 | 0.64 | m2 |
| 3 | Cement concrete with Graded Stone balast (40 mm size) excluding shuttering. In Ground floor and foundation. (a) 6:3:1 proportion P-9, Sl.-26/b | 0.05 | m3 |
| 4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. a) Pakur Variety P-24 It-4 | 0.48 | m3 |
| 5 | M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof ii) For trusses spanning above 12.00 m and up to 20 .00 m P-85, It-2/i | 0.848 | MT |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054