- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of ASANSOL DURGAPUR DEVELOPMENT AUTHORITY
- >
NTID 44469661
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Shed Stage At in Bardhaman - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Shed Stage At " in Bardhaman, India.
ASANSOL DURGAPUR DEVELOPMENT AUTHORITY
Bardhaman, West Bengal, India
NTID 44469661
- Opening Date : Mon 23rd March, 2026
- Closing Date : Sat 21st March, 2026
- ₹ 509211.00
- NTID 44469661
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
10185.00 -
Document Cost
Refer Documents -
Estimated Cost
509211.00
BOQ Items Total Items : 16 | Total Qty : 460.7
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling all types of masonary excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. | 1.00 | M3 |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. upto 150 mm. thick | 3.00 | M3 |
| 3 | Removal of rubbish , earth etc from the working site and disposal of the same beyond the compound in conformity with the municipal corporation rules for such disposal loading into truck and cleaning the site in all respect as per direction of E.I.C | 4.00 | M3 |
| 4 | Earth work in excavation of foundation trenches or drains, in all shorts of soil (including mixed soil but excludinglaterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 meter as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1.50 M . | 9.00 | M3 |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation foundation. | 9.00 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054