- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Rural Development
- >
NTID 44604551
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Sarain Bhawan in Sundernagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Sarain Bhawan " in Sundernagar, India.
Rural Development
Sundernagar, Himachal Pradesh, India
NTID 44604551
- Opening Date : Wed 1st April, 2026
- Closing Date : Tue 31st March, 2026
- ₹ 1952036.00
- NTID 44604551
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
39000.00 -
Document Cost
500.00 -
Estimated Cost
1952036.00
BOQ Items Total Items : 15 | Total Qty : 10884.75
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation, trenches, drains (Any width or square metre on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil as directed in all kinds of classification, of soils such as pick work, jumper work, blasting work saturated soils including chiseling or any other mixed variety of soils, dewatering and / or removal of slush and other incidentals within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases. | 88.20 | cum |
| 2 | Providing and laying, mechanically mixed and vibrated cement concrete 1:5:10 (one cement : Five sand : Ten graded crushed stone aggregate 40 mm (forty millimeter) nominal size) including curing complete excluding the cost of form work above plinth level up to floor all level including carriage of material within all leads, lifts and other incidentals complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 29.72 | cum |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Lintels, beams, plinth beams, girders, bressumers and cantilevers,roof etc. above plinth up to floor all level with all accessories as required as per the direction of Engineer-in-charge including carriage of materials with in all leads, lifts and other incidentals.. | ||
| 4 | Foundations, footings, bases of columns, etc. for mass concrete | 127.86 | sqm |
| 5 | Suspended floors, roofs, landings, balconies and access platform. | 280.21 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054