Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in balasore, India.
- Opening Date : Mon 9th February, 2026
- Closing Date : Mon 9th February, 2026
- ₹ 71411000.00
- NTID 43713084
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
714110.00 -
Document Cost
10000.00 -
Estimated Cost
71411000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | 4th Corrigendum | Date |
BOQ Items Total Items : 45 | Total Qty : 78922.32
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 etc. complete & as per direction of the Engineer-in-Charge. | 32500.00 | Sqm |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 | 21.60 | Cum |
| 3 | Dismantling of Cement Concrete pavment by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02cum in volume and stock piling at designated locations anddisposal of dismanteled materials up to a lead of 1000 meters stacking servicables and unservicables materials seprately | 256.88 | Cum |
| 4 | Loosening, Levelling & compacting original ground supporting embankment to facilitate placement of first layer of embankment ,scarified to a depth of 150 mm ,mixed with water at O.M.C. and then compacted by rolling so as to achieve the minimum dry density as given in Table 300-2 for embankment construction and Clause 305 of MoSRT&H Specifications for Road & Bridge works (Latest Revision ) etc. complete & as per direction of the Engineer-in-Charge. | 4835.25 | Cum |
| 5 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoRTH specifications for Road & Bridge works (4th revision) etc complete as per specification & direction of Engineer-in-Charge.. | 22968.30 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054