Inquiry NowConstruction Of Road From Shri in Cancona - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Road From Shri" in Cancona, India.
- Opening Date : Fri 11th September, 2026
- Closing Date : Thu 10th September, 2026
- ₹ 5640038.00
- NTID 46519370
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
112801.00 -
Document Cost
10000.00 -
Estimated Cost
5640038.00
BOQ Items Total Items : 16 | Total Qty : 5016
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation of foundation of structures of culverts, abntments piers, retaining walls etc. as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3.00 m depth as per MORTH Specification 304 | 231 | M3 |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. a) All kinds of soil | 122 | M3 |
| 3 | Construction of embankement with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting with Static roller to meet requirement of Table 300-2 as per MORTH specification 305 | 230 | M3 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc in pipeline trenches and other foundations complete. | 58 | M3 |
| 5 | Centering and shuttering including struttings, propping etc. and removal of formwork for a) Foundations, footings, bases for columns and mass concrete. | 542 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.