Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Road From Jhil" in Jamtara, India.
- Opening Date : Fri 18th September, 2026
- Closing Date : Tue 15th September, 2026
- ₹ 26819659.00
- NTID 46489395
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
537000.00 -
Document Cost
10000.00 -
Estimated Cost
26819659.00
BOQ Items Total Items : 39 | Total Qty : 34970.032
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 meters outside the periohery of the area as per Technical Specification clause 201 . | 1.553 | Ha |
| 2 | Clearing and grubbing road land including uprooting wild vegetationgv, grass, bushesh, shurbs,sapling and trees of girth upto 300 mm removal of stumps of such trees cut earlier and disposal of unserviceable material and stacking of serviceable material to be used or auctioned , upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm thickness as per Technical Specification clause 201 . | 1.553 | Ha |
| 3 | Dismantling of existing structure like Culvets, bridges , Retaining wall and other structure comprising of masonary , Cement concrete, wood work , steel work including T &P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 meters. | 3.4 | M3 |
| 4 | Compacting Original ground Supporting Subgrade (Loosening of the ground a level of 500 mm below the sub-grade level , watered, graded and compacted in layers to meet requirement of Table 300-2for subgrade construction) | 2022.07 | M3 |
| 5 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. | 6794.39 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054