- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Director Cum Chief Engineer RED
- >
NTID 43705343
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Allahabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Allahabad, India.
Director Cum Chief Engineer RED
Allahabad, Uttar Pradesh, India
NTID 43705343
- Opening Date : Mon 16th February, 2026
- Closing Date : Mon 16th February, 2026
- ₹ 1057000.00
- NTID 43705343
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
22000.00 -
Document Cost
2500.00 -
Estimated Cost
1057000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | extention od Date | Date |
BOQ Items Total Items : 13 | Total Qty : 1147.09
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Construction of subgrade with material obtained from borrow pits for local earth construction of embankment with approved material obtained from abailable land and permitted and approved by Engineer in charge and as per technical specification clause 301.3.4.1 with all lift and leads,spreading,gradding to required slope and copacting to meet requirment of tables 300 land,300.2 as per tech classification 301.5. including lead up to 1000 meter Cortage 2 Km | 198.00 | cum |
| 2 | Excavation in foundation in ordinary soil (loam clay or sand ) includig lift upto 1.50 metre and lead upto 30 metre . Including filling watering & ramming of excavated earth into the trenches of into the space between the building & the sides of foundatio | 35.88 | cum |
| 3 | Concrete with 40mn gauge B/B, fine sand of 1.25 FM and Cement in proportion of 12:6:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. SI.N0.273 | 8.97 | cum |
| 4 | M-150 Brick work in 1:4 cement & fine sand (1.25 F.M.) mortar morter in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of the work. Excluding GST. SI No. 305 | 25.31 | cum |
| 5 | Provoiding and Laying of 2.50 cm thick PCC 1:2:4 (Without Base Concrete) With cement coarse sand and 20 mm gauge stone grit incluidng all. As per PWD Allahabad SOR SI. No. 601A | 86.60 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054