ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Retaining Wall in Mandi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Retaining Wall" in Mandi, India.
The Himachal Pradesh State Industrial Development Corporation Limited
Mandi, Himachal Pradesh, India
NTID 47142807
- Opening Date : Wed 28th October, 2026
- Closing Date : Tue 27th October, 2026
- ₹ 654855.00
- NTID 47142807
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 10 | Total Qty : 405
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Disposal of building rubbish/ mulba/similor unserviceable , dismental or waste material by machnical means i/c loading, transporting, unloading to approved municipal dumping ground or as approved by EIC , beyond 50 mtr intial lead, for all leads i/c all lifts involved and as per direction of Engineer-in-Charge. | 46.2 | Cum. |
| 2 | Excavation in foundation, trenches etc. in earth work in all kind of soil lifts upto 1.50 mtrs. Stacking the excavated soil not mkore than 3mtrs. Clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundation etc. consolidating of all surplus excavated earth as directed within all leads and lifts disposed earth to be levelled neatly dressed and as per direction of Engineer-in-Charge. | 33.35 | Cum. |
| 3 | Providing and laying cement concrete 1:5:10 (1cement:5sand:10graded stone agregate 40mm nominal size ) and curring complete excluding cost of form work in foundation and plinth and as per direction of Engineer-in-Charge. | 10.51 | Cum. |
| 4 | Stone soiling Kharnja hand packed with spall and ineterstices complete and as per direction of Engineer-in-Charge. | 4.95 | Cum. |
| 5 | Providing from work with steel plates 3.15mm thick weled with angle iron in frame 30x30x5mm so as to give a fair finish including levelling centering, shuttering strutting and propping etc. With wooden battens and ballies, hight of propping and cenring below supporting floor two ceiling and removal of the same for instu- reinforced concrete and plain concrete work in:- (a) vertical surface sch as wall any thickness partition plaster and string course and like and as per direction of Engineer-in-Charge. | 171.15 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054