- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of Uttarakhand Renewable Energy Development Agency
- >
NTID 44261906
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Record Room In in Dehradune - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Record Room In" in Dehradune, India.
Uttarakhand Renewable Energy Development Agency
Dehradune, Uttarakhand, India
NTID 44261906
- Opening Date : Mon 16th March, 2026
- Closing Date : Fri 13th March, 2026
- ₹ 2986000.00
- NTID 44261906
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
85000.00 -
Document Cost
2360.00 -
Estimated Cost
2986000.00
BOQ Items Total Items : 45 | Total Qty : 9040.43
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Construction of Record Room in Energy Park Campus, Patel Nagar, Dehradun | ||
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 37.77 | Cum |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in de consolidating each deposited layer by ramming and watering, up to 50 m and lift upto 1.5 m. | 30.22 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.41 | Cum |
| 5 | Centring and shuttering including strutting, roping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 22.97 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054