- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of MUNICIPAL CORPORATION
- >
NTID 44238737
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Rcc Strom Wate in MADURANTGAM - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Rcc Strom Wate" in MADURANTGAM, India.
MUNICIPAL CORPORATION
MADURANTGAM, Tamil Nadu, India
NTID 44238737
- Opening Date : Thu 5th March, 2026
- Closing Date : Thu 5th March, 2026
- ₹ 18500000.00
- NTID 44238737
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
185000.00 -
Document Cost
Refer Documents -
Estimated Cost
18500000.00
BOQ Items Total Items : 8 | Total Qty : 60595
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 696.00 | Cum |
| 2 | Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, Transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications. | 116.00 | Cum |
| 3 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard speci cation and as directed by the departmental of cers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 58960.00 | Kg |
| 4 | Vibrated Reinforced Cement Concrete M-20 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for MAT Concrete | 174.00 | Cum |
| 5 | Vibrated Reinforced Cement Concrete M-20 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for SIDE WALL | 332.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054