- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Irrigation And Public Health Department
- >
NTID 42479584
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of in Multi city - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Construction Of " in Multi city, India.
Irrigation And Public Health Department
Multi city, Himachal Pradesh, India
NTID 42479584
- Opening Date : Wed 12th November, 2025
- Closing Date : Wed 12th November, 2025
- ₹ 223198.00
- NTID 42479584
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum | Date |
BOQ Items Total Items : 17 | Total Qty : 719.55
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20m in pick jumper work. (Pick work 100%) | 65.16 | Cum |
| 2 | Providing and laying in position cement concrete 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level as per the direction of Engineer-in-charge. | 0.44 | Cum. |
| 3 | Providing and laying in position reinforced cement concrete 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering and reinforcement in:- | ||
| 4 | All work up to plinth level as per the direction of Engineer-in-charge. | 0.66 | Cum. |
| 5 | walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level as per the direction of Engineer-in-charge. | 1.49 | Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054