ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Ramp For The E in Manali-HP - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Ramp For The E" in Manali-HP, India.
Himachal Pradesh Tourism Development Corporation Limited
Manali-HP, Himachal Pradesh, India
NTID 43828651
- Opening Date : Mon 16th February, 2026
- Closing Date : Mon 16th February, 2026
- ₹ 718802.00
- NTID 43828651
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 8 | Total Qty : 1495.92
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Ordinary rock as per the diretion of Engineer in Charge at site. | 16.20 | Per Cubic Meter |
| 2 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 49.70 | Per Cubic Meter |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 27.00 | Per Square Meter |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 72.40 | Per Square Meter |
| 5 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 12.60 | Per Cubic Meter |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054