- Home
- >
- Tender
- >
- Gujarat Tender
- >
- Department of Gujarat State Electricity Corporation Limited
- >
NTID 44750763
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of R c c Patrolli in Mahisagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of R c c Patrolli" in Mahisagar, India.
- Opening Date : Refer Documents
- Closing Date : Thu 23rd April, 2026
- ₹ 0.00
- NTID 44750763
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
346653.00 -
Document Cost
17700.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 28 | Total Qty : 98084.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Item 1- Clearing and grubbing road land including uprooting rank vegetation grass bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials(D) By mechanical means in area of thorny jungle. | 1.25 | Hectare |
| 2 | Item 2-Earthwork for embankment including breaking clods, dressing with all lead and lift and including watering rolling and consolidation of subgrade in layers at O.M.C. to required dry density including filling the depression which occur during the process using power roller 8T to 10T.(B) From Borrow area within 0.5KM. lead | 155.00 | CMT |
| 3 | Providing and laying 200 mm thick Granular sub-base in two later by providing coarse graded material Grading- I using B.T.M.C. (Black Trap Machine Crushed) metal 53 mm to 26.5 mm at 35 percentage , crushed stone aggregate 26.5 mm to 4.75 mm at 45 percentage and below 2.36 mm at 20 percentage ,having C.B.R. not less than 30 percentage, as per table 402 of MORTH gradation including leveling the material at site of work ,mixing and spreading into grade and camber , watering and consolidation at OMC with roller including cost of material ,labour etc complete. | 900.00 | CMT |
| 4 | Construction of Dry Lean Cement Concrete Sub- base over a prepared subgrade with Providing and laying cement concrete 1:4:8 ( 1 cement : 4 coarse sand : 8 hand broken stone aggregates 40 mm. nominal size) and curing complete excluding cost of from work in : (a) foundation and plinth. | 450.00 | CMT |
| 5 | Providing and Laying Controlled cement concrete M20 for trimix RCC road excluding the cost of reinforcement & including of using 125micron polythene sheet at base of concrete, using approved quality polyester fiber (12mm) during mixing of cement concrete(@125gm per bag) and or as per manufacturer's specification including preparing the sub base with form work of M.S Chanel of required size to maintain level and slope of concrete with using surface vibrator, finishing the surface with power floater and trove, light brooming on the surface with providing construction joints of size 10 mm wide 25mm deep in transverse direction @4.5m C/C with sealing the same with approved quality bitumen sealent and providing expansion joints of size 25 mm width and upto through depth of concrete using 25mm thick Dura Board HD-100 of approved quality and sealing the same with approved quality bitumen sealent at 40meter C/C and longitudinally for 6m wide road using concrete cutter machine with necessary equipments, labors tools tackles etc complete as dircted by EIC. [Rate As per rate analysis with Escalation/De-escalation method, Circuler Ref no. GSECL/ACE(P&C)/53] | 700.00 | CMT |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054