Tender for Greater Sharda Sahayak Command Area Development Authority - NTID 29293539
Greater Sharda Sahayak Command Area Development Authority
Lucknow, Uttar Pradesh, India
NTID 29293539
- Opening Date : Wed 12th October, 2022
- Closing Date : Wed 12th October, 2022
- ₹ 0.00
- NTID 29293539
Construction Of R.c.c. Lined Channel, Unlined Channel, R.c.c. Water Controlling Structures Works
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
96000.00 -
Document Cost
2360.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 6 | Total Qty : 10437.343
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth Work in construction of Gulls/ channel manually or by tractor where ever possible and applicable,including hard clay,chharri,bajri up to 5%, including all leads and lifts, excluding mechanical compaction but inclusive of manual compaction and dressing to profile and all T & P required for proper completion of work. | 7920.730 | cu.m. |
2 | Providing and laying LDPE 125 micron thick film(1st grade) on sub grade before construction of lining, gulls,structure etc including material,labour etc required for proper completion of work as per direction of engineer-in-charge. | 1997.590 | sq.m. |
3 | Providing and Laying cement concrete 1:4:8 (1 cement: 4 coarse sand FM>2.0 : 8 stone grit 40mm nominal size) in foundation with mechanical mixing including cost of all material with all leads and lifts including compaction and curing etc required for proper completion of work as per directions of engineer-in-charge. | 5.160 | cu.m. |
4 | Providing and laying R.C.C. 1:2:4(M-15), (1- cement: 2- coarse sand FM>2.0: 4- 20mm nominal size aggregate) excluding cost of steel but including cost of centering and shuttering, with mechanical mixing and mechnical compaction including cost of all material, expansion joins, tall leads and lifts, T & P and curing etc. required for proper completion of work as per direction of engineer-in-charge. | 262.071 | cu.m. |
5 | Providing steel reinforcement TMT bars of Primary Steel or equivalent of required dia as per drawing, including straightening, cutting ,bending,binding including cost of all material , labour and T & P etc. required for proper completion of work as per directions of engineer in charge. | 171.792 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.