
Tender for Greater Sharda Sahayak Command Area Development Authority - NTID 29203176
Greater Sharda Sahayak Command Area Development Authority
Lucknow, Uttar Pradesh, India
NTID 29203176
Opening Date : Thu 6th October, 2022
Closing Date : Thu 6th October, 2022
- ₹ 0.00
- NTID 29203176
Construction Of R.c.c. Lined Channel, Unlined Channel, R.c.c. Water Controlling Structures Works
Documents
Unlock the opportunities
Buy This Document @200/--
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
35000.00 -
Document Cost
1180.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 6 | Total Qty : 3435.18
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth Work in construction of Gulls/ channel manually or by tractor where ever possible and applicable,including hard clay,chharri,bajri up to 5%, including all leads and lifts, excluding mechanical compaction but inclusive of manual compaction and dressing to profile and all T & P required for proper completion of work. | 2692.830 | cu.m. |
2 | Providing and laying LDPE 125 micron thick film(1st grade) on sub grade before construction of lining, gulls,structure etc including material,labour etc required for proper completion of work as per direction of engineer-in-charge. | 553.360 | sq.m. |
3 | Providing and Laying cement concrete 1:4:8 (1 cement: 4 coarse sand FM>2.0 : 8 stone grit 40mm nominal size) in foundation with mechanical mixing including cost of all material with all leads and lifts including compaction and curing etc required for proper completion of work as per directions of engineer-in-charge. | 1.530 | cu.m. |
4 | Providing and laying reinforcement cement concrete 1:2:4(M-15), (1- cement: 2- coarse sand FM>2.0: 4.75mm- 20mm nominal size aggregate) excluding cost of steel but including cost of centering and shuttering, with mechanical mixing and mechnical compaction including cost of all material,expansion joints, all leads and lifts, T & P and curing etc. required for proper completion of work as per direction of engineer-in-charge. | 100.200 | cu.m. |
5 | Providing steel reinforcement TMT bars of Primary Steel or equivalent of required dia as per drawing, including straightening, cutting ,bending,binding including cost of all material , labour and T & P etc. required for proper completion of work as per directions of engineer in charge. | 62.260 | Qtl |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane