- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of WATER RESOURCES DEPARTMENT
- >
NTID 45719365
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Pucca Drain Fr in Seraikela-kharsawan - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Pucca Drain Fr" in Seraikela-kharsawan, India.
WATER RESOURCES DEPARTMENT
Seraikela-kharsawan, Jharkhand, India
NTID 45719365
- Opening Date : Wed 8th July, 2026
- Closing Date : Tue 7th July, 2026
- ₹ 2304977.00
- NTID 45719365
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
47000.00 -
Document Cost
5000.00 -
Estimated Cost
2304977.00
BOQ Items Total Items : 13 | Total Qty : 4217926.44
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item- A) and disposal of excavated soil as obtained to a distance upto 50 mtrs. Including all lifts levelling ramming the foundation trenches removing root of trees shrubs all complete as per approved design building specification and direction of E/i | 264.49 | M3 |
| 2 | providing coarse clean sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm. thick with all leads including cost of materials, labour, royalty and taxes all complete as per building specification and direction of E/I | 30.84 | M3 |
| 3 | Providing designation 75B Brick flat solling joints with local sand including cost of watering taxes and royalty all comlete as per building specification and direction of E/I. | 255.58 | M2 |
| 4 | Provinding and laying in position specified grade of reinforcement cement concrete all work up to plinth level but excluding of reinforcement, centering, shuttering and finishing as per building specification and direction of E/I. | 113.52 | M3 |
| 5 | providing centering, shuttering including strutting, propping etc. and removal of form for foundations, footing, base of coloumn etc. all complete as per building specification and direction of E/I. | 817.84 | M2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054