- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of WATER RESOURCES DEPARTMENT
- >
NTID 43018497
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Pucca Check Da in Palamau - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Pucca Check Da" in Palamau, India.
- Opening Date : Thu 11th December, 2025
- Closing Date : Wed 10th December, 2025
- ₹ 6255960.00
- NTID 43018497
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
125200.00 -
Document Cost
10000.00 -
Estimated Cost
6255960.00
BOQ Items Total Items : 24 | Total Qty : 1013029.6146
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Jungle clearance in borrow area,building premises,flanks and slopes on the road,canals and embankment by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of E/I.(Specification revised in meeting of regional Co-ordinators held on 11.01.84 in the office of T.E.C.) (Vide Item No.5.1.3.1 of WRD Part-B, Pg No.-97) /(Common Part-A Page No.-195 Sl. No.- 2.02) | 0.0496 | hectare |
| 2 | Earth work in excavation of foundation trenches of toe wall,spillway,head regulator, outlet, intake well etc. as per designed section in all kinds of soil including moorum soil, soil mixed with kankar, pebbles and boulders upto 300mm size and disposal of the same (beyond 50 m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 m as per specification and direction of E/l.(Vide Item No. - 5.1.14.1 of WRD Part -B ,Pg No.-99) | 2358.29 | M3 |
| 3 | Earth work in excavation of foundation trenches of toe wall, spillway, head regulator, intake well and outlet etc. as per designed section in ordinary rock or soft rock (where blasting is not needed) (Vide classification of soil item-C) with disposal of soil (beyond 50 m from the edge of the trenches) with initial lead of 150 m and lift of 1.5 m as per specification and direction of E/l.(Vide Item No. - 5.1.15.2 of WRD Part -B , Pg No.-100) | 129.47 | M3 |
| 4 | Extra for wet earth all complete as per specification and direction of E/I.(Vide Item No. - 7.1.22 of WRD Part - B ,Pg No.-135) | 235.83 | M3 |
| 5 | Providing and laying P.C.C. or R.C.C. M-150 with nominal mix of (1:2:4) in various component of dam foundation with approved quality of 20mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened excluding cost of shuttering or form work as well as of reinforcement, its cutting, bending, binding and placing but including necessary tools and plants and vibrating, curing, royalty and all taxes etc. complete job as per specification and direction of E/l.(Vide item No.- 5.3.6 of WRD, Pg No.- 109) / Item No.-5.3.1.2 of BCD Part- B , Pg No.- 106 | 313.76 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054