- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of WATER RESOURCES DEPARTMENT
- >
NTID 44757224
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Pucca Canal Fr in West Singhbhum - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Pucca Canal Fr" in West Singhbhum, India.
WATER RESOURCES DEPARTMENT
West Singhbhum, Jharkhand, India
NTID 44757224
- Opening Date : Sat 11th April, 2026
- Closing Date : Fri 10th April, 2026
- ₹ 32743394.00
- NTID 44757224
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
327500.00 -
Document Cost
10000.00 -
Estimated Cost
32743394.00
BOQ Items Total Items : 17 | Total Qty : 25075.237
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches of toe wall, spilway, Head regulator, intake well and outlet etc as per design senction in ordinary rock or soft rock (where blasting is not needed) ( vide classification of soil item -c ) with disposal of soil (beyond 50M away from the edge of trenches) with intial lead of 150M and initial lift 1.5M p in ordinary soil (vide classification of soil item-A) all complete as per approved design specification and direction of E/I...(Item No. WRD PART- B 5.1.21.1)) | 1575.00 | Cum |
| 2 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M and avrage lift of 1.5 m including leveling ramming the foundation trenches, removing roots of trees shrubs all complete as per approved design specification and direction of E/I.(Item No. WRD PART-B 7.1.27) | 5548.50 | Cum |
| 3 | Providing coarse clean local sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials labours royality and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume (Item No- BCD 5.1.10I) | 720.00 | Cum |
| 4 | Supplying and laying boulders in rock toe, heel trenches of Dam as per design Drawing including the cost of materials,royality and all taxes etc but excluding the cost of carriage all complete as per specification and direction of E/I. (Item No-WRD PART- B 5.6.4 PART-A 6.4) | 720.00 | Cum |
| 5 | Providing and laying PCC or RCC M-150 with nominal mix of (1:2:4) in various componenets of dam foundation with approved quality of 20mm graded coarse aggregate of required graded as per design and approved quality of sand requisite FM (2.5 to 3.0) washed and screened excluding cost of shuttering or form work as well of reinforcement, its cutting, bending, binding and placing including necessary tools and plants and vibrating, curing ,royality all taxes etc. complete job as per specification and direction of E/I.. (Item No- BCD PART-B 7.3.4 5.3.1.2 ) | 720.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054