- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Department Of Water Resources
- >
NTID 44316504
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Protection Wal in Bicholim - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Protection Wal" in Bicholim, India.
- Opening Date : Wed 11th March, 2026
- Closing Date : Tue 10th March, 2026
- ₹ 4701948.00
- NTID 44316504
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
94039.00 -
Document Cost
4000.00 -
Estimated Cost
4701948.00
BOQ Items Total Items : 6 | Total Qty : 2400
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottomS, lift upto 1.5m including getting out the excavated soil and disposal of surplus excacated soil as directed within a lead of 50m. a) All kind of soil | 672.00 | Cu.M |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 62.00 | Cu.M |
| 3 | Providing & Laying cement Concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in a) All works upto Plinth level | 288.00 | Cu.M |
| 4 | Centering and shuttering including struttings, propping etc. and removal of formworks for: a) Foundation, footings, bases for coulmns and mass concrete | 560.00 | Sqm |
| 5 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 258.00 | Cu.M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054