- Home
- >
- Tender
- >
- Bihar Tender
- >
- Department of SASHASTRA SEEMA BAL
- >
NTID 44048309
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Permanent Buil in East Champaran - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Permanent Buil" in East Champaran, India.
SASHASTRA SEEMA BAL
East Champaran, Bihar, India
NTID 44048309
- Opening Date : Fri 13th March, 2026
- Closing Date : Wed 11th March, 2026
- ₹ 47900637.00
- NTID 44048309
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
958013.00 -
Document Cost
Refer Documents -
Estimated Cost
47900637.00
BOQ Items Total Items : 238 | Total Qty : 130765.738
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation over areas (exceeding 30 cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m; disposal earth to be levelled and neatly dressed.All kinds of soil | 883 | cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 226 | cum |
| 3 | Supplying and filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. | 12 | cum |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth : consolidating each deposited layer by ramming and watering lead. | 525 | cum |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 1937.54 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054