Inquiry NowConstruction Of Permanent Boun in hapoli - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Permanent Boun" in hapoli, India.
National Hydroelectric Power Corporation Limited
hapoli, Arunachal Pradesh, India
NTID 44294364
- Opening Date : Fri 27th March, 2026
- Closing Date : Mon 23rd March, 2026
- ₹ 8588689.00
- NTID 44294364
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
172000.00 -
Document Cost
1180.00 -
Estimated Cost
8588689.00
BOQ Items Total Items : 22 | Total Qty : 73549.257
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.50 m in width as well as 10Sq.m on plan including disposal of excavated earth lead upto 50m and lift upto1.50 m. Disposed soil to be levelled and neatly dressed. | 2529.000 | Sqm |
| 2 | Earthwork in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30cm size, saturated soil and rock), lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 457.164 | Cum |
| 3 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth. | 47.472 | Cum |
| 4 | Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation and plinth | 391.315 | Sqm |
| 5 | Reinforced concrete work in foundations, footings, basesof columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : M20 (1 cement : 1.5 coarse sand :3 stone aggregate 20 mm nominal size). | 48.451 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054