- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Bodoland Territorial Council
- >
NTID 43823347
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Pedestal And I in Bongaigaon - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Pedestal And I" in Bongaigaon, India.
Bodoland Territorial Council
Bongaigaon, Assam, India
NTID 43823347
- Opening Date : Mon 23rd February, 2026
- Closing Date : Sat 21st February, 2026
- ₹ 4996531.00
- NTID 43823347
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
99931.00 -
Document Cost
1500.00 -
Estimated Cost
4996531.00
BOQ Items Total Items : 43 | Total Qty : 11654.92
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Civil works 2.6 Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil | 6.10 | cum |
| 2 | 16.12 Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : 16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 20.66 | sqm |
| 3 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 5.67 | cum |
| 4 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.93 | cum |
| 5 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 3.36 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054