- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 43921639
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 3nos Drinking in Nimapara - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 3nos Drinking " in Nimapara, India.
- Opening Date : Sat 21st February, 2026
- Closing Date : Fri 20th February, 2026
- ₹ 2143580.00
- NTID 43921639
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
21436.00 -
Document Cost
7080.00 -
Estimated Cost
2143580.00
BOQ Items Total Items : 94 | Total Qty : 2870.36
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50mtr initial lead and 1.5mtr initial lift including rough dressing and breaking of clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3mtr in depth as per direction of Engineer-in-charge. | ||
| 2 | Kisok sump portion Kisok front & all side platform balance portion Kisok protection wall right & left side Kisok protection wall [ rear side] For Laying of Loading Pipe - 25mm dia PVC pipe 110mm pipe line - for 3nos at New Bus stand, Dolabedi Chack, Tahasil Office | 40.95 | cum |
| 3 | Cutting in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials within 50m initial lead and 1.5m initial lift including rough dressing as per direction and specification of the department including stacking the useful materials separately as ordered etc as per direction of Engineer - in - Charge. UGR sump area for 3nos | 57.18 | cum |
| 4 | Supplying all materials, labour and T&P for filling approved SAND of specified quality under floors, in foundations, plinths, etc. for all depths and heights including cost of sand, royalties, transportation to site for all leads and lifts,including loading, unloading, spreading in layers all complete as per drawings, specifications and direction of Engineer-incharge. | ||
| 5 | UGR sump base Kisok front side platform stage-1 Kisok protection wall [right & left side] Kisok protection wall [rear side] UGR annular space UGR annular space for 3nos | 30.66 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054