- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Hindu Religious and Charitable Endowments Department
- >
NTID 46984255
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of New Sannadhi F in Dharmapuri - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of New Sannadhi F" in Dharmapuri, India.
Hindu Religious and Charitable Endowments Department
Dharmapuri, Tamil Nadu, India
NTID 46984255
- Opening Date : Thu 22nd October, 2026
- Closing Date : Thu 22nd October, 2026
- ₹ 5294000.00
- NTID 46984255
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
37000.00 -
Document Cost
Refer Documents -
Estimated Cost
5294000.00
BOQ Items Total Items : 39 | Total Qty : 2153.61
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and including refilling the sides of foundations clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 23) | 174 | 1 M3 (One Cubic meter) |
| 2 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 23,24) | 61 | 1 M3 (One Cubic meter) |
| 3 | Cement Concrete 1:5:10 (One of Cement, Five of crushed stone sand and Ten of hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification and as directed by the departmental officers (TNBP. Specification.No : 28 ) | 19 | 1 M3 (One Cubic meter) |
| 4 | Random Rubble masonry with Cement Mortar1:5 ( One of cement and five of M.sand) with machine mixing and using selected rough stones and Bond stones in foundation and basement including simulatenous flush pointing with same cement mortar and including cost of required wedges etc., and dewatering wherever necessary proper setting,curing,etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 35-H) | ||
| 5 | For Ground Floor | 44 | 1 M3 (One Cubic meter) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054