- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Rural Water Supply and Sanitation Department
- >
NTID 46638219
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of New 1 No Subdi in phulbani - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of New 1 No Subdi" in phulbani, India.
- Opening Date : Wed 23rd September, 2026
- Closing Date : Tue 22nd September, 2026
- ₹ 7919925.00
- NTID 46638219
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
79199.00 -
Document Cost
10000.00 -
Estimated Cost
7919925.00
BOQ Items Total Items : 128 | Total Qty : 8427.56
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Sub-Division office Supplying all labour, materials T&P for Earth work excavation of foundation trenches in all kinds of soil including moorum, stoney earth and earth mixed with boulders except sheet rocks and boulders including dressing of sides and leveling the bed up to the required depth and disposing the excavated materials away from the work site with initial lead and lift, including shoring, shuttering with cost of all labour, sundries & T & P etc. required for the work complete as directed by the Engineer in charge. | 78.97 | Cum |
| 2 | Supplying all labour, materials T&P for Filling in foundation, trenches and plinth with river sand, well watered and compacted, with top surface dressed and leveled to proper gradient including cost of all materials, conveyance, all taxes and royalties, loading and unloading, including cost of all labour, sundries, T & P etc. All complete as per directions of the Engineer -in-charge. | 95.18 | Cum |
| 3 | Supplying all labour, materials T&P for Disposal and carriage of surplus excavated earth/debries and lifting by mechanical means within 5 Km from work site and road side including loading, unloading and cost of all labour, T&P etc. Complete as per direction of the Engineer-in-charge. | 52.65 | Cum |
| 4 | Supplying all labour, materials T&P for Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. | 23.07 | Cum |
| 5 | Supplying all labour, materials T&P for Providing & applying of pre constructional anti-termit treatment by drilling 12mm dia holes at distance of 30cm @ junction of wall & floor about 300mm apart deep enough to reach the soil below & chemical emulsion (PREMISE, IMIDACHLOPRIED 30.5SC OF BAYER MAKE mixed with 47.5ltr water) pumped these holes to soak the soil 1 tr solution of each hole as per manufactures specification & the holes should be pluged the filling materials including cost of all materials, labour,conveyance, T&P, all taxes and hire charges of machinaries as per direction of Engineer-in-charge. (Make Hi-Solution pest control) services or equivalent). | 103.8 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054