- Home
- >
- Tender
- >
- Punjab Tender
- >
- Department of Tata Memorial Centre
- >
NTID 44955068
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of 2nd Floor Of S in Mohali - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of 2nd Floor Of S" in Mohali, India.
- Opening Date : Wed 6th May, 2026
- Closing Date : Tue 5th May, 2026
- ₹ 5801158.00
- NTID 44955068
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
136907.00 -
Document Cost
Refer Documents -
Estimated Cost
5801158.00
BOQ Items Total Items : 79 | Total Qty : 25612
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Providing Structural Design Services , Electrical & ELV layouts, SLD, GFC drawings, approval from client and further approval from structural consultant etc. | 1.000 | Job |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 2.000 | Cum |
| 3 | Providing and fixing of Steel reinforcement Thermo-Mechanically Treated bars of grade Fe-500D or more in column/ slabs/ footing/ foundations/ Lintels/ plinthbeam/tie beams/ chajja etc.. for R.C.C. work including straightening, cutting, bending, placing in position and binding and including of placing of cover blocks etc. all complete below plinth level and above plinth level up to V level floor. | 11477.000 | Kg |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for :Columns,, piers, roofs, Slab, abutments, pillars, posts and struts etc up to V floor Level including required scafolding Matarial Shifting and required support as per site requirements and as per direction of EIC. | 777.000 | Sqm |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers up to iii floor Level including required scafolding Matarial Shifting and required support as per site requirements and as per direction of EIC. | 27.000 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054