Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Construction Of Nagthana Cnb N" in Latur, India.
Soil and Water Conservation Department
Latur, Maharashtra, India
NTID 42742426
- Opening Date : Sat 22nd November, 2025
- Closing Date : Thu 20th November, 2025
- ₹ 3300728.00
- NTID 42742426
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
22100.00 -
Document Cost
2360.00 -
Estimated Cost
3300728.00
BOQ Items Total Items : 10 | Total Qty : 1707.77
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Item No.1:- Excavation in all kinds soil including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with all lead and all lifts as directed. | 857.20 | Cu.m. |
| 2 | Item No.2:-Excavation in Hard Murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with all lead and all lifts as directed. | 53.80 | Cu.m. |
| 3 | Item No.3 :-Excavation in Soft Rock without blasting including boulders up to 0.6 m diameter ( 0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with all lead and all lifts as directed. | 59.81 | Cu.m. |
| 4 | Item No.4 :-Excavation in Hard Rock of all toughness by blasting including boulders above 0.6 m dia.(0.113Cum) minimizing damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling /pre-splitting /smooth blasting techniques and placing the excavated rock neatly in approved dump area including cost of all materials, machinery, labour, leveling bed etc., complete with all lead & all lifts as directed. | 88.37 | Cu.m. |
| 5 | Item No.5 :- Cutting, bending, hooking, laying in position and tying M.S./ HYSD / TMT bars for reinforcement of R.C.C. work as per detailed drawing etc. complete as directed. | 2.11 | Mt. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054